The Administration des ponts et chaussées has announced that part of the A13 motorway will be closed to vehicular traffic on week-ends between July and September, including this coming week-end, from 13 - 17 July.

With the redesign of the Ehlerange tunnel, construction of a partition wall between the two tubes of the Ehlerange tunnel will require work to be carried out ovver a seris of weekends.

The first phase of the works will start from Friday evening 14 July 2017 from 20:00 until Monday morning 17 July 2017 at 06:00 and requires the A13 motorway to be blocked between the Ehlerange interchange and the Differdange interchange in both directions.

Also, on Monday, 12 July 2017, the overtaking lane will remain closed to traffic until the end of the afternoon as part of the hardening of the concrete of the partition wall.