As a result of the  construction of the road access to the future Ueschterhaff penitentiary in Sanem, respectively, work related to supply networks (water, gas, electricity, etc.), the crossing of the N32 and the CR110 Will be blocked from 20:00 on Friday 21 April until 06:00 on Monday 24 April.

Following this work, the N32 between the CR110 and the Woeller roundabout will remain blocked until Saturday 29 April 2017.

Departures to the localities of Sanem and Aessen will be set up from the Differdange / Gadderscheier interchange. The Woeller business park will remain accessible from the A13 motorway.